Land Transportation of a 120 tn Rotor from Rosario (AR) to Villeta (PY)
Transportation of a Rotor (120 tn) from Rosario (AR) to Bulgaria.
International Maritime and Land Transport of a Roll of Submarine Cable (135 tn).
Transport of Satellite Dish - Diameter 30 m, Height 40 m, total weight 2500 tons.
2
ENERGY
Atucha II: Design and preparation of the packaging, plus transportation to Germany of a 180 tn Rotor.
Ayolas Project: Transportation of 2 Transformers of 245 tons each within Argentine territory.
Ocean transportation from Mumbai (India) to Buenos Aires (AR) of 5 transformers of 40 and 80 MVA.
Maritime and land transportation of a rotor and turbine with its accessories (7,500 FRT) from EXW San Petersburg to the Los Caracoles Hydroelectric Power Plant (1,300 meters above sea level), in the province of San Juan.
Ocean and land transport of generators (110 tons), stators (105 tons), transformers (122 tons) and other components, completing approximately 7,500 FRT
HMGS was selected to transport all the gates of the ANGOSTURA Hydroelectric Power Plant – Chile.
3
MINING
Cement plant with 3000 tons daily production capacity.
Transport of 1350 FRT of mining equipment from Tilbury (UK) to El Mutum, Bolivia
Ocean and land transportation of kiln parts for cement manufacturing.
Transfer from mining base camp.
Transportation of a complete cement plant of 3000 tons of daily production capacity (35,000 FRT) from Dock Sud/Buenos Aires to La Calera/San Luis.
Transportation of 35,000 FRT as part of a cement plant with a daily production of 5,500 tons from Dock Sud to Olavarria in the Province of Buenos Aires.
Transportation of 35,000 FRT as part of a cement plant with a daily production of 5,500 tons from Zarate to Olavarria in the Province of Buenos Aires.
4
OIL AND GAS
GAS Turbine Transportation from Argentina to the USA.
Packaging, land and sea transportation from the USA to Zarate (AR).
5
PACKAGING
Industrial packaging for subsequent shipping
180 tn Rotor Packaging
SBASE: Packaging of subway cars
6
AEROSPACE INDUSTRY
ARSAT 1 - Satellite (1) - Pre-loading Survey: Prior to the logistics design, the inspection and study of each piece is carried out, packaging recommendations are given, and its handling and transportation are planned.
ARSAT 1 - Satellite (2) - Loading at INVAP: Handling and loading of the Satellite and auxiliary equipment to the means of transport, for transfer from INVAP to the Bariloche Airport.
ARSAT 1 - Satellite (3) - Loading SAT - AN124: Reception, coordination of delivery to the plane, handling and putting on board. 33,000 kg of equipment were loaded onto an Antonov 124 aircraft.
ARSAT 1 - Satellite (4) - Unloading in Cayenne: Coordination, handling of unloading of the Satellite and its auxiliary equipment from the Antonov 124 aircraft at the Cayenne airport.
ARSAT 1 - Satellite (5) - Arrival at Space Center: Shipway accompanied its client in the transportation of the Satellite from Cayenne Airport (CAY) to the CNES Aerospace base in French Guiana.